Turnkey Cleanroom Design and Construction

FEYANA designs and builds turnkey cleanrooms for electronics, pharma, medical device, food and industrial plants: survey, design, walls, ceilings, doors and floors, cleanroom HVAC, HEPA/FFU, electrical, commissioning, validation and handover.
Survey and quote: WhatsApp +84 988 641 591 – sales.00@feyana.com
Cleanroom scope
Cleanroom design
URS, ISO 14644 / GMP zoning, personnel and material flows, HVAC, electrical and controls design.
Walls, ceilings, doors, floors
Cleanroom panels, doors, windows, epoxy/vinyl and ESD floors.
Cleanroom HVAC
AHUs, EC fans, cooling coils, dehumidification, ducts, insulation, fresh air, pressure cascades.
HEPA, FFU
HEPA boxes, FFUs, pre- and fine filters; modular clean booths.
Ancillaries
Pass boxes, air showers, differential pressure gauges, cleanroom lighting, gowning lockers.
Validation, maintenance
Particle counts, HEPA leak tests, airflow, pressure; cleaning, filter changes, maintenance.
Cleanroom types
- Electronics and ESD cleanrooms.
- Medical and pharma per GMP; operating theatres, labs.
- Industrial, food and packaging.
- Modular clean booths for small areas.
Equipment FEYANA supplies for cleanrooms
AHU for healthcare and cleanrooms
FEYANA slim AHU
RadiPac EC centrifugal fan (EBM-Papst)
NanoFlex all-in-one insulation sheetHow we work
- Survey and URS: product, processes, class, temperature/humidity.
- Design of layout, HVAC, envelope, electrical and controls.
- Turnkey quotation and schedule.
- Construction of envelope, HVAC and HEPA/FFU.
- Commissioning and balancing of airflow, pressure, temperature/humidity.
- Validation and handover: test reports, training; maintenance afterwards.
Information for a quote
| Industry, product | Electronics, pharma, medical, food… |
|---|---|
| Required class | ISO 5/6/7/8 or GMP A–D |
| Area, height | Layout or existing drawings |
| Temperature, humidity | Per process |
| Schedule, location | Target date, province/city |
FAQ
Do you upgrade operating cleanrooms?
Yes: class upgrades, AHU replacement, extra FFUs, wall repairs, fixing pressure issues.
Do you validate after handover?
Yes, tests at handover and periodic validation and maintenance under contract.
Do you build modular clean booths?
Yes, for small areas needing fast, movable installation.
See also: HVAC installation, HVAC equipment.
Need a cleanroom survey or quote? WhatsApp +84 988 641 591 or sales.00@feyana.com.